Ahmed Zainul, Abideen and Fazeeda, Mohamad (2019) Supply chain lead time reduction in a pharmaceutical production warehouse – a case study. International Journal of Pharmaceutical and Healthcare Marketing, 14 (1). pp. 61-88. ISSN 1750-6123. (Published)
|
Pdf
Supply chain lead time reduction in a pharmaceutical1.pdf Download (94kB) | Preview |
Abstract
Purpose The purpose of this study is to apply value stream mapping (VSM) in Malaysian pharmaceutical production warehouse. A current and future state value stream map from the raw material receiving end to the production unit was developed to find out waste and unwanted lead time. It was very much essential to cut down the supply chain lead time at the initial phase as the raw material unloading, sorting, temporary storage and dispatch to production were seen contributing to a huge lead time build-up.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | Lean production, Lean supply chain, Lean warehousing, Pharmaceutical warehouse, Supply chain value stream mapping, Value stream mapping, Lead time reduction |
Subjects: | H Social Sciences > HD Industries. Land use. Labor |
Faculty/Division: | Faculty of Industrial Management Institute of Postgraduate Studies |
Depositing User: | Noorul Farina Arifin |
Date Deposited: | 15 Jun 2020 06:48 |
Last Modified: | 15 Jun 2020 06:48 |
URI: | http://umpir.ump.edu.my/id/eprint/28437 |
Download Statistic: | View Download Statistics |
Actions (login required)
View Item |