Items where Author is "Mohd Nasrun, Mohd Nawi"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Item Type | No Grouping
Jump to: Article
Number of items: 6.

Article

Nur Nadhirah, Muhammuddin and Mohd Suhaimi, Mohd-Danuri and Mahanim, Hanid and Fadzida, Ismail and Mohd Nasrun, Mohd Nawi (2023) A Preliminary Framework for Preventing Disputes in Different Stages of Building Construction Projects. Planning Malaysia: Journal of the Malaysian Institute of Planners, 21 (5). pp. 267-282. ISSN 0128-0945. (Published)

Ajibike, Waliu Adeniyi and Adeleke, Adekunle Qudus and Mohd Nasrun, Mohd Nawi and Bamgbade, Jibril Adewale and Mehdi Riazi, Salman Riazi and Mohd Fauzi, Ahmad and Panda, Sitansu (2023) Validating the Effects of Organizational Internal Factors and Technology Orientation on Environmental Sustainability Performance of Malaysian Construction Firms. Journal of Advanced Research in Applied Sciences and Engineering Technology, 30 (3). pp. 150-167. ISSN 2462-1943. (Published)

Adeleke, A. Q. and Mohd Nasrun, Mohd Nawi and Saipol Bari, Abd-Karim (2020) Where are we? the level of risk management in Malaysian construction industries. International Journal of Supply Chain Management (IJSCM), 9 (1). 527 -535. ISSN 2050-7399 (Online). (Published)

Ahmad Tarmizi, Haron and Marshall-Ponting, Amanda J. and Zahrizan, Zakaria and Mohd Nasrun, Mohd Nawi and Zuhairi, Abd Hamid and Kamarul Anuar, Mohamad Kamar (2015) An industrial report on the Malaysian building information modelling (BIM) taskforce: Issues and recommendations. Malaysian Construction Research Journal, 17 (2). pp. 21-36. ISSN 1985-3807 (Print), 2590-4140 (Online). (Published)

Ahmad Tarmizi, Haron and A., Marshall-Ponting and Mohd Nasrun, Mohd Nawi and Mohd Harris, Ismail (2014) Building information modelling: A case study approach to identify readiness criteria for process requirement. American-Eurasian Journal of Sustainable Agriculture, 8 (7S2). pp. 85-91. ISSN 1995-0748. (Published)

Mohd Nasrun, Mohd Nawi and Ahmad Tarmizi, Haron and Zuhairi, Abd Hamid and Kamarul Anuar, Mohamad Kamar and Yusnizam, Baharuddin (2014) Improving Integrated Practice through Building Information Modeling-Integrated Project Delivery (BIM-IPD) for Malaysian Industrialised Building System (IBS) Construction Projects. Malaysian Construction Research Journal, 15 (2). pp. 1-15. ISSN 1985-3807. (Published)

This list was generated on Sun Dec 22 19:11:39 2024 +08.