Browse by Author All List

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Authors | Item Type | No Grouping
Number of items: 1.

Faten, Albtoush and Doh, Shu Ing and Abdul Rahimi, Abdul Rahman and Ja’far A., Aldiabat Al-Btoosh and Syeda Maria, Zaidi (2020) Factors affecting the accuracy of cost estimate in construction projects: a review. In: National Conference for Postgraduate Research (NCON-PGR 2020) , 9 December 2020 , Virtual Mode. pp. 1-8.. (Published)

This list was generated on Wed Nov 27 13:07:06 2024 +08.