Siti Zulaiha, Zainol (2015) Study of assesment of supply and demand of parking at Giant Hypermarket, Kuantan. Faculty of Civil Engineering & Earth Resources, Universiti Malaysia Pahang.
|
Pdf
FKKSA - SITI ZULAIHA BINTI ZAINOL (CD9250).pdf Download (413kB) | Preview |
Abstract
This project is researched about assessment of supply and demand of parking at Giant Hypermarket, Kuantan. In case study, a method of study has been conducted which is survey and data collection are done at there. Data collection is about to collect the number of vehicles (excluded motorcycle, lorry, technician van) entering and out of parking. Collections of data are taken during Giant Hypermarket operation which is starting 9:00 am until all vehicles are fully out of that hypermarket. So, from data collection the results and analysis are obtained were duration of parking, accumulation, Parking Turn-Over (PTO), Parking Index (IP) and average of parking duration. Besides that, data collections are done on weekdays and weekends during non-salary week and salary week. Lastly, as a conclusion these hypermarket’s parking is not sufficient during weekends and weeks of salary but in weekdays, the parking is sufficient
Item Type: | Undergraduates Project Papers |
---|---|
Additional Information: | Undergraduates Project Papers (Bachelor of Civil Engineering and Earth Resources) – Universiti Malaysia Pahang - 2015 |
Uncontrolled Keywords: | Supply and demand |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Faculty/Division: | Faculty of Civil Engineering & Earth Resources |
Depositing User: | Ms. Nurul Ain Shahira Suhaimi |
Date Deposited: | 16 Mar 2016 06:55 |
Last Modified: | 18 Jan 2022 15:37 |
URI: | http://umpir.ump.edu.my/id/eprint/12109 |
Download Statistic: | View Download Statistics |
Actions (login required)
View Item |