Composing of Lead Time Reduction Approach in Assembling an Electrical Product

Intan Bazliah, Mohd and Abdullah, Ibrahim (2016) Composing of Lead Time Reduction Approach in Assembling an Electrical Product. International Journal of Industrial Management (IJIM), 2. pp. 27-39. ISSN 2289-9286 (Print); 0127-564x (Online). (Published)

[img] PDF
ftech-2016-abdullah-Composing of Lead Time Reduction Approach.pdf
Restricted to Repository staff only

Download (886kB) | Request a copy
[img]
Preview
PDF
ftech-2016-abdullah-Composing of Lead Time Reduction.pdf

Download (19kB) | Preview

Abstract

The paper explores the lead time reduction projects that have been implemented in an electrical product assembly line, called subwoofer speaker. Observation has been conducted on 26 workstations which are involved in an assembly line. Group discussion, real-time study, and action research have been performed to reduce cycle time. The result shows that most ideas are able to reduce cycle time to as minimum as 0.1 seconds from the original cycle time. In other words, the project is able to give an impact of at least 520 seconds on daily normal working hours. Besides, it also enhances the participation of the employee in reducing lead time while improving production capacity

Item Type: Article
Uncontrolled Keywords: Cycle Time, Lead Time, Assembly Line
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
Faculty/Division: Faculty of Engineering Technology
Depositing User: Noorul Farina Arifin
Date Deposited: 05 Aug 2016 07:55
Last Modified: 01 Feb 2018 07:33
URI: http://umpir.ump.edu.my/id/eprint/13927
Download Statistic: View Download Statistics

Actions (login required)

View Item View Item