Modelling of Two-sided Assembly Line Balancing Problem with Resource Constraints

Muhammad Razif, Abdullah Make and M. F. F., Ab Rashid and Muhamad Magffierah, Razali (2016) Modelling of Two-sided Assembly Line Balancing Problem with Resource Constraints. In: IOP Conference Series: Materials Science and Engineering, International Engineering Research and Innovation Symposium (IRIS) , 24-25 November 2016 , Melaka, Malaysia. pp. 1-9., 160 (012005). ISSN 1757-8981 (Print), 1757-899X (Online)

[img]
Preview
PDF
2016 Make_2016_IOP_Conf._Ser. Modelling.pdf
Available under License Creative Commons Attribution.

Download (1MB) | Preview

Abstract

Two-sided assembly line balancing (2S-ALB) problems is practically useful in improving the production of large-sized high-volume products. Many published papers have proposed various approaches to balance this well-known ALB problem. However, little attention is given in formulating the 2S-ALB problems. In this paper, 2S-ALB is modelled with four different objective functions comprising minimization of workstations, mated- workstation, idle time and resource constraints. In different with existing model, this paper also considers resource constraint with a mathematical modelling formulation in solving the 2S- ALB problems. The modelling procedures are present for each objective functions with a simple 2S-ALB example problem. Then, the anticipated performance solution is obtained from the test problem.

Item Type: Conference or Workshop Item (Lecture)
Uncontrolled Keywords: Two-sided assembly line balancing (2S-ALB)
Subjects: T Technology > TS Manufactures
Faculty/Division: Faculty of Mechanical Engineering
Depositing User: Dr. Mohd Fadzil Faisae Ab. Rashid
Date Deposited: 20 Dec 2016 02:27
Last Modified: 20 Dec 2016 02:27
URI: http://umpir.ump.edu.my/id/eprint/15756
Download Statistic: View Download Statistics

Actions (login required)

View Item View Item