A study to identify the factor that causes project delay in construction at Terengganu

Nurul Syakirah, Mohd Ali (2016) A study to identify the factor that causes project delay in construction at Terengganu. Faculty of Industrial Management, Universiti Malaysia Pahang.

[img]
Preview
Pdf
10.A study to identify the factor that causes project delay in construction at Terengganu.pdf - Accepted Version

Download (1MB) | Preview

Abstract

This survey was conducted to find the factors causing time overrun (delay) from the contractor perspective. The objective of this study was to identify the factors and in order to rank the most influence factor. Sets of questionnaires were developed and data was collected by hand distributed and email. The scope of study focused on the construction project in Terengganu. The respondent of this study obtain from contractors registered under G7 with CIDB. The result of this study showed that the higher rate in delay come from external factor. External factor consist three subjects such as weather condition, natural disaster and unavoidable disaster.

Item Type: Undergraduates Project Papers
Additional Information: Project Paper (Bachelor Degree in Project Management with Honors) -- Universiti Malaysia Pahang – 2016, SV: DATIN HAJAH MAZITA BINTI MOKHTAR, CD NO.: 10354
Uncontrolled Keywords: project delay; construction
Subjects: H Social Sciences > HD Industries. Land use. Labor
H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management
Faculty/Division: Faculty of Industrial Management
Depositing User: Ms. Nurezzatul Akmal Salleh
Date Deposited: 16 Jan 2017 05:43
Last Modified: 20 Mar 2023 03:13
URI: http://umpir.ump.edu.my/id/eprint/16030
Download Statistic: View Download Statistics

Actions (login required)

View Item View Item