Effect of Lean Tools to Control External Environment Risks of Construction Projects

Ansah, Richard Hannis and Sorooshian, Shahryar (2017) Effect of Lean Tools to Control External Environment Risks of Construction Projects. Sustainable Cities and Society, 32. pp. 348-356. ISSN 2210-6707. (Published)

[img] PDF
Effect of Lean Tools to Control External Environment Risks of Construction Projects.pdf - Published Version
Restricted to Repository staff only

Download (753kB) | Request a copy
[img]
Preview
PDF
Effect of Lean Tools to Control External Environment Risks of Construction Projects 1.pdf - Published Version

Download (118kB) | Preview

Abstract

Among the existing management concepts and methods implemented for solving construction project delays is the integration of lean tools in the construction project cycle. While these lean tools are said to minimize delays and improve project delivery processes, most have been conceptualized to assess aspects of the lean tools. However, to ensure suitability and applicability, and thus, the success of lean tools implementation, there is the need for identification and appropriate prioritization of the lean tools. This paper proposes a novel delay control framework based on AHP method for the evaluation of lean tools application in the external environment (political, economic, social, technological, legal, and environmental aspects) of construction projects. To extend the qualitative data, six main delay sources and forty lean tools were extracted from the existing literature for further empirical inquiry. The results of the framework indicated that the most effective lean tools were concurrent engineering, last planner system and daily huddle meetings with priorities 0.425235, 0.379652 and 0.371172 respectively. Meanwhile, the least influenced lean tool was found to be SMART Goals with priority 0.026566. This framework, would provide a decision tool for practitioners to determine appropriate lean tools to control specific delay sources.

Item Type: Article
Uncontrolled Keywords: Analytic Hierarchy Process (AHP); Construction projects; Environmental-based delays; FrameworkLean tools; Prioritization
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management
Faculty/Division: Faculty of Industrial Management
Institute of Postgraduate Studies
Depositing User: Mrs. Neng Sury Sulaiman
Date Deposited: 18 Jul 2017 08:19
Last Modified: 21 Feb 2020 07:49
URI: http://umpir.ump.edu.my/id/eprint/18177
Download Statistic: View Download Statistics

Actions (login required)

View Item View Item