Optimal placement of TCSC for reactive power planning using grasshopper optimization algorithm considering line outage (N-M)

No default citation style available for Eprints

[img]
Preview
Pdf
26.1 Optimal placement of TCSC for reactive power planning.pdf

Download (85kB) | Preview

Abstract

Increment of power demand in power system can cause a rapid reduction in voltage profile that can disrupt the system stability thus make an entire system failure as the system has to work under contingencies and stress conditions. In this paper, Grasshopper Optimization Algorithm (GOA) has been applied for solving the reactive power planning, considering a line outage occurs in the system with Thyristor Controlled Series Compensator (TCSC) which minimizes transmission power loss. Standard IEEE-30 bus test system has been applied to the test system. Optimal setting of all control variables, namely locations and the sizes of the TCSC has been determined by GOA and power flow analysis method. The investigation is carried out via simulation using MATPOWER and MATLAB software.

Item Type: Conference or Workshop Item (Lecture)
Additional Information: Indexed by Scopus
Uncontrolled Keywords: TCSC; Optimization; Transmission loss; Line outage; GOA
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
Faculty/Division: Faculty of Electrical & Electronic Engineering
Depositing User: Pn. Hazlinda Abd Rahman
Date Deposited: 21 Nov 2019 03:06
Last Modified: 21 Nov 2019 03:06
URI: http://umpir.ump.edu.my/id/eprint/25488
Download Statistic: View Download Statistics

Actions (login required)

View Item View Item