Productivity study and line balancing of GGMG & CALICO production line

Hartini, Mustafa and A. R., Yusoff and M. Yusoff, Ismail (2012) Productivity study and line balancing of GGMG & CALICO production line. Advanced Materials Research, 576. pp. 700-704. ISSN 1022-6680 (print), 1662-8985 (online). (Published)

[img]
Preview
Pdf
Productivity study and line balancing of GGMG & CALICO production line.pdf

Download (276kB) | Preview

Abstract

Assembly line balancing is assumed to have fixed task within specified task time during the initial stage of the mass production. The problem of current case study of this assembly line was the production line cannot meet the expected output plan with imbalance station cycle time. In this paper, productivity study and line balancing is applied to improve production line of GGMG & CALICO. The desired cycle time defined using the Standard Time Data (STD) which required the person to perform assign task till completion by defining the performance rating of person. The proposed solution proved by the implementation analysis conducted in the research. The results showed that the productivity of production line which is tremendously increased within 50% after implementation. There are six factors identified during the study which are bottleneck stations, workpiece flow, line layout, ergonomic, resource assignment and buffer allocation.

Item Type: Article
Additional Information: Indexed by Scopus
Uncontrolled Keywords: Assembly Line; Cycle Time; Line Balancing; Productivity; Simulation
Subjects: T Technology > TS Manufactures
Faculty/Division: Faculty of Manufacturing Engineering
Depositing User: Mrs. Neng Sury Sulaiman
Date Deposited: 22 Mar 2020 23:48
Last Modified: 22 Mar 2020 23:48
URI: http://umpir.ump.edu.my/id/eprint/26998
Download Statistic: View Download Statistics

Actions (login required)

View Item View Item