Nurul Izati, Shahidan (2019) Best practices to prevent out of sequence construction activities. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang.
|
Pdf
06.Best practices to prevent out of sequence construction activities.pdf - Accepted Version Download (801kB) | Preview |
Abstract
Delays in the construction industry are not something alienated anymore. The common problems and challenges in construction project are delay in implementation and operation. One of the causes of construction delays are out of sequence construction activities. Therefore, this study is conducted to identify the feasible practices to prevent out of sequence in construction projects. The research method that is being used in this study is individual interviews with industry practitioners from the construction industry. The findings of this study have shown that the most highlighted practices to prevent out of sequence construction activities lie upon the upper management and lower management that involves in the construction project itself.
Item Type: | Undergraduates Project Papers |
---|---|
Additional Information: | Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2019, SV: DR. ABDUL RAHIMI BIN ABDUL RAHMAN, NO. CD: 12514 |
Uncontrolled Keywords: | Delays; construction industry |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Faculty/Division: | Faculty of Civil Engineering & Earth Resources |
Depositing User: | Mrs. Sufarini Mohd Sudin |
Date Deposited: | 13 Oct 2020 00:37 |
Last Modified: | 23 May 2023 10:11 |
URI: | http://umpir.ump.edu.my/id/eprint/29544 |
Download Statistic: | View Download Statistics |
Actions (login required)
View Item |