Best practices to prevent out of sequence construction activities

Nurul Izati, Shahidan (2019) Best practices to prevent out of sequence construction activities. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang.

[img]
Preview
Pdf
06.Best practices to prevent out of sequence construction activities.pdf - Accepted Version

Download (801kB) | Preview

Abstract

Delays in the construction industry are not something alienated anymore. The common problems and challenges in construction project are delay in implementation and operation. One of the causes of construction delays are out of sequence construction activities. Therefore, this study is conducted to identify the feasible practices to prevent out of sequence in construction projects. The research method that is being used in this study is individual interviews with industry practitioners from the construction industry. The findings of this study have shown that the most highlighted practices to prevent out of sequence construction activities lie upon the upper management and lower management that involves in the construction project itself.

Item Type: Undergraduates Project Papers
Additional Information: Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2019, SV: DR. ABDUL RAHIMI BIN ABDUL RAHMAN, NO. CD: 12514
Uncontrolled Keywords: Delays; construction industry
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Faculty/Division: Faculty of Civil Engineering & Earth Resources
Depositing User: Mrs. Sufarini Mohd Sudin
Date Deposited: 13 Oct 2020 00:37
Last Modified: 23 May 2023 10:11
URI: http://umpir.ump.edu.my/id/eprint/29544
Download Statistic: View Download Statistics

Actions (login required)

View Item View Item