Abd Rahman Fahmi, Mat Hasan (2012) Analyze the inefficient takt time production and high customer complaint for support wheel carrier component to improve Lean production system level at Autokeen Sdn.Bhd. Faculty of Manufacturing Engineering, Universiti Malaysia Pahang.
|
PDF
ABD_RAHMAN_FAHMI_BIN_MAT_HASAN.PDF Download (804kB) |
Abstract
This project presents a research to analyze the inefficient takt time production and high customer complaint for support wheel carrier part to improve level of Lean Production System (LPS) at Autokeen Sdn Bhd.The case study method has been conducted at Autokeen Sdn Bhd especially at support wheel carrier workstation.The main purpose of this research is to give the recommendation to improve the takt production and customer complaint criteria in Autokeen LPS evaluation. From the research,the finding shows that the process cycle time for produce support wheel carrier is over the customer takt time.This problem because the customer takt time never being calculates and be display at support wheel carrier workstation. For the customer complaint criteria,many cases of defect part are delivering to customer because of man power carelessness.After all problems root causes being analyze the recommendation is given to improve the criteria of takt production and customer complaint.
Item Type: | Undergraduates Project Papers |
---|---|
Uncontrolled Keywords: | Production control Lean manufacturing |
Subjects: | T Technology > TS Manufactures |
Faculty/Division: | Faculty of Manufacturing Engineering |
Depositing User: | Shamsor Masra Othman |
Date Deposited: | 12 Nov 2013 02:54 |
Last Modified: | 12 Jul 2021 03:31 |
URI: | http://umpir.ump.edu.my/id/eprint/3738 |
Download Statistic: | View Download Statistics |
Actions (login required)
View Item |