Understanding the causes and effects of low-risk management: implementation in projects using the DEMATEL algorithm

Lee, Chia Kuang and Wong, Wen Nee and Nurhaizan, Mohd Zainudin and Ahmad Huzaimi, Abd Jamil (2023) Understanding the causes and effects of low-risk management: implementation in projects using the DEMATEL algorithm. In: Research Handbook on Project Performance. Edward Elgar Publishing Ltd, U.K., pp. 92-114. ISBN 9781802207613 (Online), 978-1802207606 (Printed)

[img]
Preview
Pdf
Understanding causes and effects of low risk.pdf

Download (586kB) | Preview
[img] Text
book/9781802207613/book-part-9781802207613-14.xml - Published Version

Download (298kB)
[img] Pdf
Projects using the DEMATEL algorithm.docx

Download (14kB)

Abstract

Construction projects are generally exposed to a wide range of risks, the majority of which have a direct impact on the organizations’ ability to achieve project objectives. However, many organizations overlook the importance of incorporating risk management into their projects. Previous studies paid little attention to the interdependence of the factors influencing the implementation of risk management in projects. To achieve project success and improve project performance, it is critical to identify the primary risk factors that must be carefully controlled to reduce the impact and alleviate the causes. The purpose of this study is to determine the causes and consequences of low-risk management implementation. To identify the essential causes and consequences, DEMATEL is utilized to prioritize the elements and examine their interaction. This study elicited responses from 17 people. The correlations between the causes and effects of low risk management adoption are shown to be significant. The findings also revealed that resistance to change is the most important factor for a lack of risk management adoption. Consequently, management should pay more attention to this issue in order to improve risk management and thus improve project performance in construction projects.

Item Type: Book Chapter
Additional Information: This Book Chapter is Scopus Cited. https://www.scopus.com/record/display.uri?eid=2-s2.0-85161280840&origin=resultslist&sort=plf-f
Uncontrolled Keywords: Construction Industry; Risk Management; Decision Making Trial & Evaluation Laboratory (DEMATEL)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Faculty/Division: Faculty of Industrial Management
Depositing User: Dr. Lee Chia Kuang
Date Deposited: 20 Jul 2023 03:47
Last Modified: 20 Jul 2023 03:47
URI: http://umpir.ump.edu.my/id/eprint/38061
Download Statistic: View Download Statistics

Actions (login required)

View Item View Item