Analysing the project delay causes and improving quality using multi-project strategies

Nur Amirah Syahirah, Azman and Faizir, Ramlie and Wan Zuki Azman, Wan Muhamad and Mohd Yazid, Abu and Nolia, Harudin (2024) Analysing the project delay causes and improving quality using multi-project strategies. Journal of Advanced Research in Business and Management Studies, 34 (1). pp. 23-34. ISSN 2462-1935. (Published)

[img]
Preview
Pdf
Analysing the Project Delay Causes andImproving Quality using Multi-Project Strategies.pdf
Available under License Creative Commons Attribution Non-commercial.

Download (968kB) | Preview

Abstract

Numerous reasons for project delays from the viewpoints of the client and the contractor have only been somewhat studied. The aim of this paper is to recognize the delays' underlying causes and issues ways to reduce them considering the progress of the project. Consequently, 106 contractor-side experts and 82 client-side experts in project management were the subjects of this study. The clients and contractors gave the same importance to factors like poor communications and governmental approvals in projects that were successful (had a time delay of less than 10%). Similar mitigating techniques including rigorous project monitoring, skill development training, and effective logistics planning were advised. When projects were unsuccessful (with a time delay of more than 10%), they displayed a wide range of behaviours.

Item Type: Article
Uncontrolled Keywords: Project management; Delay management; Mitigation strategy
Subjects: H Social Sciences > HD Industries. Land use. Labor
T Technology > TS Manufactures
Faculty/Division: Faculty of Manufacturing and Mechatronic Engineering Technology
Depositing User: Mrs Norsaini Abdul Samat
Date Deposited: 17 May 2024 03:17
Last Modified: 17 May 2024 03:17
URI: http://umpir.ump.edu.my/id/eprint/41252
Download Statistic: View Download Statistics

Actions (login required)

View Item View Item