Zhi Jia, Ling (2014) Impact of cost overrun factors on the project delay in construction industry, Pahang, Malaysia. Faculty of Industrial Management, Universiti Malaysia Pahang.
|
PDF
FIST - Ling Zhi Jia 1.pdf Download (2MB) | Preview |
Abstract
This thesis is about impact of cost overrun to the project delay in the project life cycle. This study will focus on the Grade 7 construction companies in the Pahang. 40 project managers and site contractors from the construction industry in Pahang participated in the survey questionnaire. There are two variable in this study which are independent variables (Cost overrun factors) and dependent variable (Project delay). Reliability test is used to identify whether the variable is reliable or not. The result of Cronbach’s Alpha for all variables shows that the involved variables are reliable ranging from 0.874 to 0.951. Single mean t-test is used to identify the environmental factor which shows a high value of 4.37. Pearson correlation results indicate that the all the cost overrun factors has a positive relationships with the project delay. Finding in this study is beneficial to employer to understand how important cost overruns factors to project delay, as well as to prevent recurrences from happening in construction industry
Item Type: | Undergraduates Project Papers |
---|---|
Additional Information: | Faculty of Industrial Management Project paper (Bachelor of Project Management with Honours) -- Universiti Malaysia Pahang - 2014 |
Uncontrolled Keywords: | Construction industry Management Cost effectiveness |
Subjects: | T Technology > TH Building construction |
Faculty/Division: | Faculty of Industrial Management |
Depositing User: | Mr. Syed Mohd Faiz Syed Abdul Aziz |
Date Deposited: | 09 Oct 2015 01:30 |
Last Modified: | 06 Aug 2021 01:57 |
URI: | http://umpir.ump.edu.my/id/eprint/10703 |
Download Statistic: | View Download Statistics |
Actions (login required)
View Item |