Items where Subject is "T Technology > TH Building construction"

Click here for a simple search.
[feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
 
 
Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Authors | Item Type
Jump to: A | C | E | F | H | I | J | K | L | M | N | P | R | S | T | U | W | Y | Z
Number of items at this level: 142.

A

Adam Zakwan, Zainuddin (2015) Application of drone in visual inspection for construction project. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang.

Ahmad Syafiq, Shiro (2009) Small sweep. Faculty of Mechanical Engineering, Universiti Malaysia Pahang.

Aida Shafina, Shofi (2012) Sound identification in the swiftlet house. Faculty of Electrical & Electronics Engineering, Universiti Malaysia Pahang.

Ainaa Farhana, Rosli (2015) Acceptance of an innovation toward performance within construction industry. Faculty of Industrial Management, Universiti Malaysia Pahang.

Akmalhabibi, Rosli (2013) Condition monitoring of faculty air conditioning system. Faculty of Mechanical Engineering , Universiti Malaysia Pahang.

Amin Ridzuan, Ishak (2015) UMP bina rumah kabin. Berita Harian .

Andri, Kusbiantoro and Mohd Sobri, Ibrahim and Khairunisa, Muthusamy and Aizat, Alias (2012) Development of Sucrose and Citric Acid as the Natural Based Admixture for Fly Ash Based Geopolymer. In: The 3rd International Conference on Sustainable Future for Human Security, 3 - 5 October 2012 , Kyoto University, Japan. .

Andri, Kusbiantoro and Muhd Fadhil, Nuruddin and Nasir, Shafiq and Sobia, Anwar Qazi (2012) The Effect of Microwave Incinerated Rice Husk Ash on the Compressive and Bond Strength of Fly Ash Based Geopolymer Concrete. Construction and Building Materials, 36 . pp. 695-703. ISSN 0950-0618

Ansah, Richard Hannis and Sorooshian, Shahryar and Shariman, Mustafa and Duvvuru, Gomanth (2016) Advancing Towards Delay-Free Construction Project: A Review. In: Proceedings of the 2016 International Conference on Industrial Engineering and Operations Management, 23-25 September 2016 , Detroit, Michigan, USA. pp. 744-751.. ISBN 978-0-9855497-5-6

Ansah, Richard Hannis and Sorooshian, Shahryar and Shariman, Mustafa and Duvvuru, Gomanth (2016) Assessment of Environmental Risks in Construction Projects: A Case of Malaysia. In: Proceedings of the 2016 International Conference on Industrial Engineering and Operations Management, 23-25 September 2016 , Detroit, Michigan, USA. pp. 752-763.. ISBN 978-0-9855497-5-6

Ansah, Richard Hannis and Sorooshian, Shahryar and Shariman, Mustafa and Duvvuru, Gomanth (2016) An Environmental Impact Framework for Evaluating Construction Projects Delays. In: Proceedings of the 2016 International Conference on Industrial Engineering and Operations Management, 23-25 September 2016 , Detroit, Michigan, USA. pp. 764-772.. ISBN 978-0-9855497-5-6

Arivahnathan, Pandiyan (2014) Factors affecting the performance of Klang Valley mass rapid transit project-study on improving the project performance. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang.

Azizuddin, Abd Aziz (2014) Air-conditioning system with simultaneous control of sensible and latent heat for building energy conservation in Malaysia. PhD thesis, Kyushu University.

Azmeen Aida, Azizul Hamid (2010) A study of internal lighting comfortability at lecture room. Faculty of Civil Engineering & Earth Resources, Universiti Malaysia Pahang .

C

Chang, Ting Wai (2014) A study on the implementation of relationship management (supply chain management) in Malaysia construction industry. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang.

Che Amri, Che Azmi (2012) Compressed concrete block using crushed laterite brick as sand substitution. Faculty of Civil Engineering and Earth Resources , Universiti Malaysia Pahang .

Cheng, Hock Tian (2011) Engineering Properties of Epoxy Polymer Cement Concrete Reinforced with Glass Fibers. Journal of Engineering and Applied Sciences, 6 (3). pp. 191-199. ISSN 1816-949X

E

Engku Mohd Amri, Engku Ariff (2007) Autonomous lighting and security system. Faculty of Electrical & Electronic Engineering, Universiti Malaysia Pahang.

F

Fatin Fazlinda, Hamzah (2016) A study on the factor effecting project delay in the housing construction. Faculty of Industrial Management, Universiti Malaysia Pahang.

H

Hamada, Hussein M. and Ahmad Tarmizi, Haron and Zahrizan, Zakaria and Humada, Ali M. (2016) Challenges and Obstacles of Adoption BIM Technology in the Construction Industry in Iraq. In: Proceedings of The National Conference for Postgraduate Research (NCON-PGR 2016), 24-25 September 2016 , Universiti Malaysia Pahang (UMP), Pekan, Pahang. pp. 43-48..

Hamizah, Jasmi (2010) Determination of direction factor, Md for MS1553:2002 wind loading for building structure. Faculty of Civil Engineering & Earth Resources , Universiti Malaysia Pahang .

Harrison Yan, Rolland Duat (2014) Causes of time delay in construction Sarawak, Malaysia. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang.

Hazim Adly Harun, Harun (2015) Case study on delay factors in steel bridge construction. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang.

Hazwani, Harif (2012) Impact of poor management in construction. Faculty of Civil Engineering, Universiti Malaysia Pahang.

Hemaambiegey, Gunasekgerin (2014) Proposal for an effective bus stop design at Hentian Bandar of Rapid Kuantan. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang.

I

Intan Diana, Musa (2012) The causes and effect of delay in construction industry project. Faculty of Civil Engineering & Earth Resources, Universiti Malaysia Pahang.

J

Juliana, Junaidi (2016) Solid waste management in building construction site. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang.

K

Khairul Faiq, Selaiman (2006) Case study : demolition practice of old MARA building on Lot 1767, Lot 1218 and Pt 4, Section 46, mukim Bandar Kuala Lumpur, Jalan Tuanku Abdul Rahman. Faculty of Civil & Environmental Engineering, Universiti Malaysia Pahang.

Khairun Nisa, Affandi (2014) A comparative study of BIM and CAD (architecture). Faculty Of Civil Engineering & Earth Resources, Universiti Malaysia Pahang.

L

Lau, Zi Thiam (2014) A study on the implementation of safety practices in Malaysia construction industry. Faculty of Civil Engineering & Earth Resources, Universiti Malaysia Pahang.

Laupa, Junus (2014) Bangunkan kabin mesra alam. [UMP News]

Laupa, Junus and Ashriq Fahmy, Ahmad (2014) Bata hijau mesra alam. [UMP News]

Lee, Chia Kuang and Hasahudin, Hassan and Nurhaizan, Mohd Zainudin (2010) Towards Zero Accidents In Construction Projects : Promoting Hirarc As An Effective Tools To Reduce Accidents. In: 3rd International Graduate Conference On Engineering, Sciences & Humanities (IGCESH 2010), 02-04 November 2010 , Universiti Teknologi Malaysia Johor Bahru, Johor. pp. 1-3..

Lee, Chia Kuang and Yusmin, Jaafar (2013) Prioritization of Factors Influencing Safety Performance on Construction Sites: A Study Based on Grade Seven (G7) Main Contractors' Perspectives. In: International Proceedings of Economics Development and Research: International Conference on Business, Management and Governance (ICBMG2012), 29-30 December 2012 , Hong Kong. pp. 6-12., 57. ISSN 2010-4626

Leong, Kuan Yoke (2014) Design coordination in design development using building information modeling. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang.

Loh, Mei Yee (2014) Challanges of building information modelling (BIM) in project implementation. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang.

Lyntia, Ping Jawa (2012) A study on solid waste generation and composition from commercial sources (case study: Taman Tas Kuantan). Faculty of Civil Engineering & Earth Resources, Universiti Malaysia Pahang.

M

M. H. A., Rasid and M. S. M., Sani (2014) Experimental study on noise mapping of split unit air conditioner system. Auto Inexss (8). ISSN 1985-8434

Mahendran, Moorthy (2010) Performance of solar air-conditioning system using heat pipe evacuated tube collector. Faculty of Mechanical Engineering, Universiti Malaysia Pahang.

Mahmoodian, Reza and Hamdi, M. and Hassan, M. A. and Akbari, Abolghasem (2015) Mechanical and Chemical Characterization of a TiC/C System Synthesized Using a Focus Plasma Arc. PLoS ONE, 10 (6). pp. 1-10. ISSN 1932-6203

Marshiela, Maedika (2014) The effect of wind force on metal deck roof joint. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang .

Marziatulhikmah, Maslan (2010) Assessment of building structure opening for dwelling. Faculty of Civil Engineering & Earth Resources , Universiti Malaysia Pahang .

Md Khusairi, Baharun (2012) The study local level supply in Malaysia construction industry : strategies in improvement. Faculty of Civil Engineering & Earth Resources, Universiti Malaysia Pahang.

Meor Airol Shafiq, Meor Shamsuddin (2012) Cost effective comparison between concrete and steel composite structure for 2 storeys building. Faculty of Civil Engineering & Earth Resources, Universiti Malaysia Pahang.

Mohamad Nadzif, Zahirudin (2009) Performance evaluation of Proton Waja car air conditioning system. Faculty of Mechanical Engineering, Universiti Malaysia Pahang .

Mohamad Shariff, Ramli (2012) Waste minimization by recycling construction waste. Faculty of Civil Engineering & Earth Resources, Universiti Malaysia Pahang.

Mohammad Affendy, Omardin (2013) Penjenamaan semula tenaga mahir selenggara bangunan. Berita Harian, (22 Fe . p. 31.

Mohammad Affendy, Omardin The Traditional Malay House. Pekan Review, 4 . pp. 48-49. ISSN 2180-3099

Mohammad Solhi, Mohammed (2010) The analysis of factors contributed to delay and method to analyze the delay in construction project. Faculty Of Civil Engineering & Earth Resources, Universiti Malaysia Pahang.

Mohd Hafis, Othman (2010) A study on problems of bumiputera contractor in construction industry. Faculty of Civil Engineering and Earth Resources , Universiti Malaysia Pahang .

Mohd Illahi, Mohd Ashri (2010) Study of safety management & professional to achive zero accidents in construction site. Faculty of Civil Engineering & Earth Resources , Universiti Malaysia Pahang .

Mohd Iskandar Zulkarnain, Talib (2010) Cost control in construction project of the site. Faculty of Civil Engineering and Earth Resources , Universiti Malaysia Pahang .

Mohd Izuan, Abu Samah (2012) A study on compressive strength and water absorption in cement brick using RHA as part of sand replacement. Faculty of Civil Engineering & Earth Resources, Universiti Malaysia Pahang.

Mohd Johari, Othman (2006) Planning & scheduling by using Microsoft Project a case study of "suggestion for construction and completion the Science Department for University Islam Antarabangsa Malaysia, Bandar Indera Mahkota, Kuantan, Pahang". Faculty of Civil & Environmental Engineering, Universiti Malaysia Pahang.

Mohd Khalild, Abdul Kadir (2006) Construction planning and scheduling a case study of "Cadangan membina dan menyiapkan Kulliyyah Sains untuk Universiti Islam Antarabangsa Malaysia. Faculty of Civil and Environmental Engineering, Universiti Malaysia Pahang.

Mohd Nor Idrus, Mat Shariff (2008) Automatic air conditioning control system. Faculty of Electrical & Electronic Engineering, Universiti Malaysia Pahang.

Mohd Nurarif, Zulhemay (2012) Review the implementation waste management practices in construction work around Taman Indera Sempurna, Pekan-Kuantan, Pahang Darul Makmur. Faculty of Civil Engineering & Earth Resources, Universiti Malaysia Pahang.

Mohd Rosazuwad, Mohamad@Muda (2010) The factors and effect of delay in government construction project (case study in Kuantan). Faculty of Civil Engineering & Earth Resources , Universiti Malaysia Pahang.

Mohd Syazwan Nizam, Mohd Moni (2012) The implementation of industrialised building system in construction industry. Faculty of Civil Engineering & Earth Resources, Universiti Malaysia Pahang.

Mohd Tarmizi, Abd Aziz (2007) Development of automatic gate opener mechanism. Faculty of Mechanical E1ngineering, University Malaysia Pahang.

Mohd Yuhyi, Mohd Tadza (2016) Industry Centre of Excellence (ICOE): Graduate Employability through BIM Initiatives. In: Seminar on Building Information Modeling (BIM) Initiative In 11th Malaysian Plan, 5 April 2016 , MDec, Cyberjaya. pp. 1-20.. (Unpublished)

Mohd Zamri, Mohd Kama (2012) A study of humidity effect toward the quality of air from air conditioning system. Faculty of Mechanical Engineering, Universiti Malaysia Pahang.

Mohd. Aizad, Johari (2013) Application of industrialised building system in school project in Malaysia: the challenge. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang.

Muhaiza , Awang (2015) Building information modelling creating customized wall family liblary using revit 2014. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang.

Muhamad Khumaini, Kuzaiman (2008) Analyze the sprinkler system in UMP lecture room using CFD (Computational Fluid Dynamics) analysis. Faculty of Mechanical Engineering, Universiti Malaysia Pahang.

Muhammad Fadhli, Othman (2012) Design and fabricate gas stove stand and extractor hood stand. Faculty of Mechanical Engineering , Universiti Malaysia Pahang.

Muhammad Hanif, Abd Rasid (2008) Noise source identification of split unit air conditioner system. Faculty of Mechanical Engineering, Universiti Malaysia Pahang.

Muhammad Muslim , Ramle (2012) Efficiency in construction process. Faculty of Civil Engineering & Earth Resources, Universiti Malaysia Pahang.

Muhammad Shahmi , Mat Saat (2011) A study on domestic subcontractor in Kota Bharu : critical analysis of construction management in handling local project. Faculty of Civil Engineering & Earth Resources, Universiti Malaysia Pahang.

Muhammad Syaiful Safwan , Nordin (2015) Materials takeoff in building information modeling. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang.

N

Nadia Faira , Mat Zali (2010) Force pattern in roofing system due to wind load. Faculty of Civil Engineering & Earth Resources, Universiti Malaysia Pahang.

Nadia Izaty, Baharuddin (2015) Communication tools and issues among the construction project team. Faculty of Industrial Technology Management, Universiti Malaysia Pahang.

Nasly, Mohamed Ali and Abu Azam, Md Yassin and Norhaiza, Nordin and Khairunisa, Muthusamy (2011) Sustainable Housing Using An Innovative Mortarless Interlocking Blockwork System – The Effect Of Palm Oil Fly Ash (Pofa) As An Aggregate Replacement. In: International Building & Infrastructure Technology Conference 2011, 7-8 Jun 2011 , Penang, Malaysia. pp. 73-81..

Nasly, Mohamed Ali and Abu Azam, Md Yassin and Zahrizan, Zakaria and Khairunisa, Muthusamy (2010) Compressed Stabilised Earth as Load Bearing Interlocking Block. International Journal of Civil Engineering and Geo-Environmental, 1 (1). pp. 1-9. ISSN 21802742

Ng, Soo Nee @ Kerry Ng (2010) Level of awareness for wind flow assessment in urban development (Malaysia). Faculty of Civil & Enviromental Engineering, Universiti Malaysia Pahang .

Nik Alia Haifaa , Nik Adik (2014) A study on impact of employee training on project performance in construction industry in Kota Bharu, Kelantan. Faculty of Industrial Management, Universiti Malaysia Pahang.

Nik Farahiyah , Nik Mohamed (2014) Cost comparison between the construction of conventional method and interlocking block system. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang.

Nik Sukry, Ramli (2014) UMP perkenal bangunan mesra alam. Berita Harian . p. 18.

Nina Nadia, Sahim (2012) A study of performance analysis of fan coil unit system for FKM�s air conditioner. Faculty of Mechanical Engineering, Universiti Malaysia Pahang.

Noor Azirhan , Sahat (2012) The challenges of green building implementation in Malaysia. Faculty of Civil Engineering and Earth Resources , Universiti Malaysia Pahang.

Noor Yuhana, Maamor (2009) Safety aspect in installation industrialized building system (IBS) component. Faculty of Civil Engineering and Earth Resources , Universiti Malaysia Pahang.

Noorul Amimah, Ismail (2014) Implementation of industrialised building system (BS) in Malaysia construction industry. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang.

Nor Afifah , Zabidi (2012) Building defect investigation and analysis. Faculty of Civil Engineering & Earth Resources, Universiti Malaysia Pahang.

Nor Aini , Abdul (2014) Malaysian building information modelling (BIM) implementation roadmap: identifying stakeholders interest. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang.

Nor Farahin, Baharudin (2014) Comparative study in construction scheduling by using primavera P6 and microsoft project. Faculty of Civil Engineering & Earth Resources, Universiti Malaysia Pahang.

Nor Hashimah, Mohd Fuzi (2014) Planning & scheduling for construction project: a case study of duration estimation & influence factors. Faculty Of Civil Engineering & Earth Resources, Universiti Malaysia Pahang.

Nor Laily, Mat Aris (2010) Assessment of skills, knowledge and training for buildings maintenance managers in Kuantan, Pahang. Faculty of Civil Engineering and Earth Resources , Universiti Malaysia Pahang .

Nor Rizman, Abas (2010) Risk assessment for demoliition works in Malaysia. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang .

Nor Salwana, Mohammad Idris (2016) UMP guna sisa enap kumbahan hasilkan batu bata S-BRICK. UMP News . (Unpublished)

Norasima, Jamaludin (2010) Critical causes factor of fall accident in construction site. Faculty of Civil Engineering & Earth Resources, Universiti Malaysia Pahang.

Nordiyana, Ab.llah (2010) The assessment of building defects maintenance in hospital building. Faculty of Civil Engineering & Earth Resources , Universiti Malaysia Pahang .

Norjan, Arasat (2014) Recycled brick masonry aggregate in hollow section beam. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang.

Norsyahidatul Nazirah , Ismail (2012) Factors that affect the performance of public project in Malaysia. Faculty of Civil Engineering & Earth Resources, Universiti Malaysia Pahang.

Nur Darwani, Abd Rahman (2012) Problems of building defects after handing over the key. Faculty of Civil Engineering & Earth Resources, Universiti Malaysia Pahang.

Nur Diyana, Md. Kasim (2009) Building defect : case study at Taman Seri Indah , Pulau Pinang. Faculty of Civil Engineering & Earth Resources , Universiti Malysia Pahang.

Nur Fatihah, Zakeri (2015) The causes and effect of delay to handover the project in construction industry. Faculty of Industrial Management, Universiti Malaysia Pahang.

Nuraziemah, Zainal (2016) The earthquake effect of multi-storey building due to surrounding earthquake in Malaysia. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang.

Nurfarahana, Yaacob (2010) A study of refurbishment of listed buildings into a new facilities. Faculty of Civil Enginering and Earth Resources , Universiti Malaysia Pahang .

Nurhafizah , Nashruddin (2012) Strength analysis of cold-rolled steel roof truss members consist of hat channel and c-channel with different thickness. Faculty of Civil Engineering and Earth Resources , Universiti Malaysia Pahang .

Nurhajar, Abd Rahman (2009) A survey on problem faced by contractors using design and build contract. Faculty of Civil Engineering & Earth Recources, University Malaysia Pahang.

Nurhidayah, Azmy and Ahmad Zairi, Mohd Zain (2016) The Application of Technology in Enhancing Safety and Health Aspects on Malaysian Construction Projects. ARPN Journal of Engineering and Applied Sciences, 11 (11). pp. 7209-7213. ISSN 1819-6608

Nurul Anis , Mazni (2013) A research on critical factors that influence construction productivity related to human power in Gambang and Kuantan. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang.

Nurul Atiqah , Ajis (2012) Study on the improvement code of practices in structural design and material specifications. Faculty of Civil and Environmental Engineering, niversiti Malaysia Pahang.

Nurul Jannah , Aziz (2012) Analysis of risk on construction site. Faculty of Civil Engineering and Earth Resources , Universiti Malaysia Pahang .

Nurul Nabila, Abdul Latef (2014) The role of consultant in adoption of green building practice in response to climate change. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang.

Nurulashikin, Daud (2014) Study on building information modeling (BIM) process flow in construction industry: a model exploratory approach to research. Faculty Of Civil Engineering & Earth Resources, Universiti Malaysia Pahang.

Nurulfatiha , Ismail (2013) Linear static analysis of a steel roof truss. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang.

Nurulzanna, Idris (2014) Process flow for work breakdown structure in plannning and scheduling : a comparative case study. Faculty Of Civil Engineering & Earth Resources, Universiti Malaysia Pahang.

Nuur Husna, Hasnin (2012) A Preliminary Development of Baseline For Normal Condition of Local Exhaust Ventilaton System (Lev)By Using Mahalanobis Distance (Md) Method. Faculty of Chemical & Natural Resources Engineering, Universiti Malaysia Pahang.

P

Priscilla Serimah, Bundan (2011) The assessment of material application through timber traditional Malay house construction. Faculty of Civil Engineering & Earth Resources, Universiti Malaysia Pahang.

R

Racqueal Manggau , Donold (2013) Causes, effects and possible solutions of variation order in project performance. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang.

Rafidah, Saidin (2013) The effect of solar geometry on a window shade for energy efficient design of building. Faculty of Mechanical Engineering , Universiti Malaysia Pahang.

Rosezaimee, Abdullah @ Ismail (2015) The managerial perspective on influx of foreign workers in construction companies in Pahang. Faculty of Industrial Management, Universiti Malaysia Pahang.

Rosmimie, Abdullah (2013) Industrial gas piping system for chemical engineering laboratory Universiti Malaysia Pahang. Faculty of Chemical & Natural Resources Engineering, Universiti Malaysia Pahang.

Ruhama, Walled (2010) Simulation of natural ventilation system in chemistry laboratory of faculty chemical and natural resources engineering lab building. Faculty of Chemical & Natural Resources Engineering , Universiti Malaysia Pahang .

S

Shashi Kumar, S A Karagaratnan (2008) Development of semi-automatic solar gate system (Mechanical Part). Faculty of Mechanical Engineering, Universiti Malaysia Pahang.

Siti Aishah, Mat Ali (2012) Cost comparison for construction of house using conventional and interlocking block method. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang .

Siti Aminah, Tukiman and Sabarudin, Mohd (2009) Investigate The Combination Of Coconut Shell And Grained Palm Kernel To Replace Aggregate In Concrete: A Technical Review. In: The Proceeding of National Conference on Postgraduate Research (NCON-PGR) 2009, 1st October 2009 , UMP Conference Hall, Malaysia. . (Unpublished)

Siti Norhafiza , Othman (2012) New fire alarm and smoke detector sensor using CCTV. Faculty of Manufacturing Engineering, Universiti Malaysia Pahang.

Siti Nursyazwani, Kahapah (2015) Awareness of implementation building information modelling (BIM) in construction industries. Faculty of Industrial Management, Universiti Malaysia Pahang.

Suhaida Noorein, Iskandar Mirza (2010) Critical success factors and barriers for industrialised building system (IBS) adoption in construction project. Faculty of Civil Engineering and Earth Resources , Universiti Malaysia Pahang.

Suhaiza, Subri (2014) Study on the problems that influence the success contractor in Kuantan. Faculty of Civil Engineering & Earth Resources, Universiti Malaysia Pahang.

Syah Hairizal, Kamalul Arifin (2014) UMP jalin kerjasama MSSA, CIDB. Berita Harian . p. 26.

Syahrul Ramadhan, Ahmad Kamal Ariffin (2013) Computation of solar radiation heat gain in analysing energy efficient operation of an air-conditioning system. Faculty of Mechanical Engineering , Universiti Malaysia Pahang.

Syazana, Abdul Aziz (2010) The application of industrialised building system in residential project. Faculty of Civil Engineering & Earth Resources, Universiti Malaysia Pahang.

T

Tan, Kean Wei (2015) A study of delay sources of construction project in Kuantan area. Faculty of Industrial Management, Universiti Malaysia Pahang.

U

UMP, . (2015) 20 syarikat, individu terima penganugerahan CIDB. Kosmo .

UMP, . (2015) Guna kontena bina rumah. Kosmo .

UMP, . (2014) Memperkasakan pembinaan struktur keluli. Berita Harian .

UMP, . (2011) Tempurung sawit dikitar semula menjadi bahan binaan. CREATE (11). ISSN 1823-7487

UMP, . (2015) UMP cadang bina rumah kontena. Sinar Harian .

UMP, PNC Oil palm shell recycled into construction material. Pekan Review, 5 . p. 31. ISSN 2180-3099

UMP, PNC (2016) Projek WBL PUO-UMPH dalam bidang sivil dan pembinaan. UMP News . (Unpublished)

Umairah ‘Aqilah, Sudin (2015) The impact of benchmarking approach towards performance in construction industry. Faculty of Industrial Management, Universiti Malaysia Pahang.

W

Wong, Michael Sie Ung (2012) Simulation behaviour of fire response to fire resistance steel beams /. Faculty of Civil Engineering & Earth Resources, Universiti Malaysia Pahang.

Y

Yap, Qing Fu (2013) A study on the causes and methods to prevent construction delay in Selangor state and Kuala Lumpur. Faculty Of Civil Engineering & Earth Resources, Universiti Malaysia Pahang.

Youventharan, Duraisamy and Airey, David (2015) Performance of Biocemented Sydney Sand using ex-situ mixing technique. DFI Journal: The Journal of the Deep Foundations Institute, 9 (1). pp. 48-56. ISSN 1937-5247 (print); 1937-5255 (online)

Yusnani, Husli (2011) The assessment of measurement application for timber traditional Malay house. Faculty of Civil Engineering & Earth Resources, Universiti Malaysia Pahang.

Z

Zahrizan, Zakaria (2007) Web based information model to support maintenance and operations management. Masters thesis, Universiti Malaysia Pahang.

Zhi Jia, Ling (2014) Impact of cost overrun factors on the project delay in construction industry, Pahang, Malaysia. Faculty of Industrial Management, Universiti Malaysia Pahang.

Zuliza Amina , Zulkifli (2012) Effective safety management ethics for construction industry. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang .

Zulkarnain , Muhamad (2013) Adaptable effectiveness of industrialised building (IBS) in construction projects. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang.

This list was generated on Wed Mar 29 10:42:15 2017 MYT.

 

 

 

 

 

 

Introduction

An Institutional Repository is an online focus for collecting, preserving, and disseminating any University publication in the digital form for the intellectual sharing.
The UMP Institutional Repository (UMP IR) provides access of University publication such as journal article, conference paper, research paper, thesis and dissertations.


Any Enquiries

Please email or call Knowledge Management staff:-

Pn. Noorul Farina (noorul@ump.edu.my) OR
Cik Ratna Wilis Haryati (haryati@ump.edu.my)

Any correspondence concerning this specific repository should be sent to umplibrary@ump.edu.my