Hazim Adly Harun, Harun (2015) Case study on delay factors in steel bridge construction. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang.
|
PDF
HAZIM ADLY HARUN BIN HARUN.PDF Download (885kB) | Preview |
Abstract
Delay in construction is a norm in certain instances especially in large complex construction projects. With different kinds of delay causing different length of delays to the completion date of the project make it a real deal that needs attention by the authorities and the construction parties. Delay factors come in many forms that impact the project differently. In view of the Industrialized Building System (IBS) approach that aims to provide a better quality construction, solutions to the delay factors have to be relevant in both traditional and modern system. This research aims to find out the factors that are directly associated to IBS structures particularly steel bridge through observations and interview sessions with the technical workers involved. Structured interview questions are used in seeking for information. This is then followed by analysis made using the observations made at the factory and site.Discussions and rankings of associated delay factors are done to highlight the best solutions.
Item Type: | Undergraduates Project Papers |
---|---|
Additional Information: | Faculty of Civil Engineering and Earth Resources Project paper (Bachelor of Engineering (Civil Engineering)) -- Universiti Malaysia Pahang– 2015 |
Uncontrolled Keywords: | Building Safety measures Industrialized building |
Subjects: | T Technology > TH Building construction |
Faculty/Division: | Faculty of Civil Engineering & Earth Resources |
Depositing User: | Mr. Syed Mohd Faiz Syed Abdul Aziz |
Date Deposited: | 20 Oct 2015 02:14 |
Last Modified: | 05 Aug 2021 02:49 |
URI: | http://umpir.ump.edu.my/id/eprint/10843 |
Download Statistic: | View Download Statistics |
Actions (login required)
View Item |