Putri Zulaiha, Razi and Noram Irwan, Ramli and Mohamad Idris, Ali (2018) Risk Identification for the Construction of Public-Private Partnership (PPP) Housing In Malaysia. Kaav International Journal of Science , Engineering & Technology, 5 (ISS-4/A7). pp. 43-47. ISSN 2348-5477. (Published)
|
Pdf
RISK IDENTIFICATION FOR THE CONSTRUCTION OF PUBLIC-PRIVATE PARTNERSHIP (PPP) HOUSING IN MALAYSIA.pdf Download (283kB) | Preview |
Abstract
The construction project is quite complex and involves many stages of the process as well as various parties involved in the realization of a construction project whether from the industry itself or the authorities. This work is a preparatory from the full length studies that aiming in developing a risk management framework for PPP Housing. This study is conducted after seen the necessary of a systematic analysis of risk in construction delay from cradle to grave i.e pre-construction to post-construction stages. Nevertheless, this study aim to develop a clear understanding among construction industry players and professionals in Malaysia. It is therefore important to find the risk factors that led to the delay and multiple parties involved that causing the delay.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | Public-Private Partnership (PPP), Risk Management, Construction Risk, Pre-Construction, Post-Construction |
Subjects: | T Technology > TH Building construction |
Faculty/Division: | Faculty of Civil Engineering & Earth Resources |
Depositing User: | Dr. Doh Shu Ing |
Date Deposited: | 02 Jan 2019 09:05 |
Last Modified: | 02 Jan 2019 09:05 |
URI: | http://umpir.ump.edu.my/id/eprint/23535 |
Download Statistic: | View Download Statistics |
Actions (login required)
View Item |