Romzi, N. A. and Doh, S. I. (2022) Underlying causes of construction project delay: A review. Construction, 2 (2). pp. 7-11. ISSN 2785-8731. (Published)
|
Pdf
Underlying Causes of Construction Project Delay.pdf Available under License Creative Commons Attribution. Download (257kB) | Preview |
Abstract
Delay is a worldwide problem which normally occurs in every project. Delay of the project occurs when a period of time of the completion date is late or postponed. Since the project is delayed, the cost of the project will have escalation which will risk the contractors. Instead of getting a benefit from the project, they gain losses. Similarly, other construction projects in different countries are prone to face delays. The aim of this study is to summarise the causes of delay in the construction project from previous study. Regarding the causes of construction project delay, the major countries in the world have faced slow decision making, poor site management and supervision, shortage of labour, changes of scope of work during construction, late in revising and approving design documents, etc. The identification of important delay causes helps a contractor to plan well before the project start.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | Construction project; Delay |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TH Building construction |
Faculty/Division: | Institute of Postgraduate Studies Faculty of Civil Engineering Technology |
Depositing User: | Mrs Norsaini Abdul Samat |
Date Deposited: | 03 Jan 2023 02:12 |
Last Modified: | 03 Jan 2023 02:12 |
URI: | http://umpir.ump.edu.my/id/eprint/36211 |
Download Statistic: | View Download Statistics |
Actions (login required)
View Item |