Mohammad S., Al-Mohammad and Ahmad Tarmizi, Haron and Rahimi, A. Rahman and Yasir, Alhammadi (2023) Factors affecting BIM implementation in Saudi Arabia: a critical analysis. International Journal of Building Pathology and Adaptation. ISSN 2398-4708. (In Press / Online First) (In Press / Online First)
|
Pdf
Factors affecting BIM.pdf Download (561kB) | Preview |
|
Pdf
Factors affecting BIM implementation in Saudi Arabia a critical analysis.pdf Restricted to Repository staff only Download (1MB) | Request a copy |
Abstract
Purpose: This study examines the underlying relationships between the critical factors of building information modeling (BIM) implementation and the factors’ groupings among architecture, engineering and construction (AEC) organizations in Saudi Arabia. The objectives of the study are to (1) identify the critical factors for BIM implementation, (2) analyze the interrelationships between the critical factors and (3) compare the critical factors between the different organizational characteristics. Design/methodology/approach: First, potential factors were identified through a systematic literature review and interviews with AEC professionals. Then, a questionnaire survey was sent to AEC professionals and the collected data were analyzed using the following techniques and tests: mean score ranking, standard deviation, normalized value, factor analysis (FA), analysis of variance (ANOVA) and post-hoc Tukey test. Findings: The analyses show that 14 factors are critical for BIM implementation in Saudi Arabia. The top critical factors include the existence of standard contracts on data security and user confidentiality, consistent views on BIM among stakeholders and the availability of guidelines for implementing BIM. Of the 14 critical factors, 9 can be grouped into 4 underlying factors: environmental, governmental, legal and organizational. The analysis shows that the criticality of the most critical factors grouped by the FA varies between different levels of BIM competency. Finally, the presence of public–private partnerships (PPPs) in realizing BIM projects is a new and emerging critical factor for BIM implementation in Saudi Arabia. Originality/value: This study differs from prior works on BIM implementation in Saudi Arabia by using FA to explore the underlying relationships among factors of BIM implementation and the factors’ groupings. Based on the FA results, a roadmap for implementing the BIM was developed. These findings will help to purposefully and efficiently customize BIM implementation strategies and initiatives to ensure successful BIM implementation in Saudi Arabia.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | Automation; Building information modeling; Inferential statistics; Multivariate analysis; Saudi Arabia |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TH Building construction |
Faculty/Division: | Faculty of Civil Engineering Technology Institute of Postgraduate Studies |
Depositing User: | Miss Amelia Binti Hasan |
Date Deposited: | 03 Jul 2023 07:53 |
Last Modified: | 12 Jul 2023 07:50 |
URI: | http://umpir.ump.edu.my/id/eprint/37895 |
Download Statistic: | View Download Statistics |
Actions (login required)
View Item |