Chai, Changsaar and Tang, Joseph Tzuenyao and Chan, Szewen and Lee, Chia Kuang and Goh, Kaichen (2023) BIM Integration in Agile Scrum During The Design Phase. Journal of Engineering Science and Technology, Special Issue 4. pp. 302-316. ISSN 1823-4690. (Published)
This is the latest version of this item.
Pdf
BIM INTEGRATION IN AGILE.pdf Download (446kB) |
Abstract
The architectural, engineering, and construction (AEC) industry has explored various methods to lower project costs while improving quality and productivity. Building Information Modeling (BIM) and Scrum have demonstrated a high potential in assisting in achieving these objectives. BIM technology is essential as a technical container for the information model of a building project and as a new construction strategy that amalgamates other benefits outlined in the existing literature. This study examined the commonalities between Agile Scrum (AS) and Building Information Modeling (BIM) and explored the possibility of integrating BIM into the Agile Scrum framework, called BIM-Scrum. BIM-Scrum was formed by extracting core similarities between the study of BIM and Scrum. The design phase of the BIM project life cycle and its relevant components are extracted from CIDB Guide 5 for integration with Scrum. The "Collaboration Production of Information" phase and its relevant BIM components (Employer's Information Requirement (EIR), BIM Execution Plan (BEP), Task Information Delivery Plan (TIDP), Master Information Delivery Plan (MIDP) are extracted from the BIM life cycle to be synthesised with Scrum. Specific adjustments and refinements are recommended to allow BIM adaptation into Scrum during the adaptation process. Several interviews were conducted as part of the outcome review procedure, and content analysis was used to identify, characterise, and understand the interview data. The benefits of BIM-Scrum were identified, and adoption strategies were examined throughout the process. Finally, the BIM-Scrum framework was developed as a reference model for the Malaysian construction industry at the end of the research
Item Type: | Article |
---|---|
Uncontrolled Keywords: | Agile scrum; Building information modelling (BIM); Design phase; Project management. |
Subjects: | H Social Sciences > HD Industries. Land use. Labor H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management T Technology > TA Engineering (General). Civil engineering (General) T Technology > TH Building construction |
Faculty/Division: | Faculty of Industrial Management |
Depositing User: | Dr. Lee Chia Kuang |
Date Deposited: | 30 Aug 2023 06:10 |
Last Modified: | 17 Nov 2023 01:29 |
URI: | http://umpir.ump.edu.my/id/eprint/38513 |
Download Statistic: | View Download Statistics |
Available Versions of this Item
- BIM Integration in Agile Scrum During The Design Phase. (deposited 30 Aug 2023 06:10) [Currently Displayed]
Actions (login required)
View Item |