Public monitoring of environmental management plan implementation in road construction projects : Key performance indicators

Nurol Huda, Dahalan and Abdul Rahimi, Abdul Rahman and Saffuan, Wan Ahmad and Che Khairil Izam, Che Ibrahim (2023) Public monitoring of environmental management plan implementation in road construction projects : Key performance indicators. Journal of Engineering, Design and Technology. pp. 1-26. ISSN 1726-0531. (In Press / Online First) (In Press / Online First)

[img] Pdf
Public monitoring of environmental management plan.pdf
Restricted to Repository staff only

Download (411kB) | Request a copy
[img]
Preview
Pdf
Public monitoring of environmental management plan implementation in road construction projects_Key performance indicators_ABS.pdf

Download (63kB) | Preview

Abstract

This study aims to examine the performance indicators (PIs) for assessing environmental management plan (EMP) implementation in road construction projects. The specific objectives are to compare the key PIs between environment auditors and environment officers and among project stakeholders, develop components to categorize interrelated key PIs and evaluate the effectiveness of interrelated key PIs and components. Design/methodology/approach: Thirty-nine PIs were identified through a systematic literature review and in-depth interviews with environmental professionals. Subsequently, a questionnaire survey was designed based on this list of PIs and distributed to industry professionals. Sixty-one responses were collected in Malaysia and analyzed using the mean score ranking, normalization, agreement analysis, overlap analysis, factor analysis and fuzzy synthetic evaluation. Findings: The analyses identified 18 key PIs: soil erosion, dust appearance, spill of chemical substance, construction waste, clogged drainage, overflowed silt trap, oil/fuel spills, changes in the colour of bodies of water, excessive cut and fill, vegetation depletion, changes in the colour of the runoff water, landslide occurrence, slope failures, irregular flood, public safety, deforestation, open burning and increased of schedule waste. Also, the key PIs can be grouped and ranked into the following four components: geological, pollution, environmental changes and ecological. Finally, the overall importance of the key PIs is between important and very important. Originality/value: This study is a pioneer in quantitively examining the key PIs for EMP implementation in road construction projects. Researchers, industry practitioners and policymakers can use the findings to develop strategies and tools to allow public monitoring of EMP implementation.

Item Type: Article
Additional Information: Indexed by Scopus
Uncontrolled Keywords: Environmental management plan (EMP); Factor analysis; Fuzzy synthetic evaluation (FSE); Performance indicators; Road construction; Sustainable construction
Subjects: T Technology > T Technology (General)
T Technology > TA Engineering (General). Civil engineering (General)
Faculty/Division: Institute of Postgraduate Studies
Faculty of Civil Engineering Technology
Depositing User: Mr Muhamad Firdaus Janih@Jaini
Date Deposited: 30 Apr 2024 06:25
Last Modified: 30 Apr 2024 06:25
URI: http://umpir.ump.edu.my/id/eprint/40506
Download Statistic: View Download Statistics

Actions (login required)

View Item View Item