Modeling the causes and mitigation measures for cost overruns in building construction : The case of higher education projects

Alhammadi, Yasir and Al-Mohammad, Mohammad S. and Rahimi, A. Rahman (2024) Modeling the causes and mitigation measures for cost overruns in building construction : The case of higher education projects. Buildings, 14 (2). pp. 1-26. ISSN 2075-5309. (Published)

[img]
Preview
Pdf
Modeling the Causes and Mitigation Measures for Cost Overruns.pdf
Available under License Creative Commons Attribution.

Download (797kB) | Preview

Abstract

The formidable need for building projects places greater pressure on stakeholders to deliver these projects on time, within the budget, and with high quality. However, many building projects have experienced extensive cost overruns despite extensive research on their causes and mitigation measures. Thus, the effectiveness of mitigation measures is questionable. This study examines the status of cost overrun in building construction projects and develops a structural equation model to establish the relationships between causes of cost overrun and mitigation measures, using higher education building projects as a case study. This study analyzed cost overruns in 27 higher education building projects. Furthermore, 118 responses were collected using a questionnaire survey and analyzed using descriptive statistics, the Kruskal–Wallis H test, exploratory factor analysis, and partial least-squares structural equation modeling (PLS-SEM). The findings suggest that around 93% of the 27 higher education building projects experienced cost overrun, and the majority overran between 5% and 10%. The findings illustrate that bid evaluation and project planning mitigation measures positively affect efficiency and contract management- and design-related causes. Furthermore, project initiation and contractor selection mitigation measures positively affect claim management-, efficiency and contract management-, estimation and scheduling-, and design-related causes. These findings will help policymakers make informed decisions in selecting effective mitigation measures to reduce cost overrun and improve industry efficiency.

Item Type: Article
Additional Information: Indexed by Scopus
Uncontrolled Keywords: Cost overrun; Higher education building projects; Mitigation measures; Saudi Arabia; Structural equation modeling
Subjects: T Technology > T Technology (General)
T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TH Building construction
Faculty/Division: Institute of Postgraduate Studies
Faculty of Civil Engineering Technology
Depositing User: Mr Muhamad Firdaus Janih@Jaini
Date Deposited: 27 May 2024 04:10
Last Modified: 27 May 2024 04:10
URI: http://umpir.ump.edu.my/id/eprint/41324
Download Statistic: View Download Statistics

Actions (login required)

View Item View Item